What this tool does
Calculates concrete volume for slabs, patios, sidewalks, and driveways. Cubic yards and cubic meters.
Calculates the cubic yards of concrete needed for a flat slab based on length, width, and thickness.
People also use
Formula Used
Formula Used
How the concrete slab calculator works
A flat slab for a patio, path, shed base or driveway is a rectangular block of concrete, so its volume is length times width times thickness. The calculator multiplies the three, adds a wastage allowance for an uneven base and spillage, and returns the volume to order: V = L × W × T × (1 + w). It multiplies the result by your price per cubic yard or metre for a cost, and shows how many bags of pre-mixed concrete the same job would take. It runs in your browser and shows its formula.
The US default is a slab 16 ft long, 10 ft wide and 4 in thick (4.9 m by 3.0 m by 102 mm). That is an area of 160 ft² (14.9 m²) and a volume of 160 × 4 ÷ 12 = 53.3 ft³, or 1.98 yd³. With 5% wastage the order is 2.07 yd³, and at $180 per yd³ it costs $373.33. The metric default is 5 m by 3 m by 100 mm. That is 15 m² and 1.50 m³, or 1.58 m³ with 5% wastage, and at 135 per m³ it costs 212.63. Thickness has a direct effect: the same US slab at 6 in is 2.96 yd³ net, 50% more concrete than at 4 in.
Typical concrete wastage
The default of 5% covers spillage and the concrete left in the chute or barrow. It suits a level, well-prepared base. A base that is uneven or has low spots takes more concrete than the flat figure suggests, and a slab poured against rough ground needs 10% or more. Round the order up to the volume your supplier sells, and for bagged concrete round up to whole bags. A short pour is expensive to fix, while a few spare bags cost little.
What this tool does not do
It does not design the slab. It does not choose the thickness, reinforcement, joints or sub-base for the load it will carry, and it does not calculate the gravel base or any membrane under it. It assumes one flat rectangle of constant thickness. For an L shape, a slab with a thickened edge, or a slope, split it into rectangles and add them. The bag count and the ready-mix note are guides. They are not a quote.
On-site considerations for concrete slab
Patios, paths and shed bases are commonly 4 in (100 mm) thick, and a driveway or a slab that takes vehicles is thicker, often 5 to 6 in (125 to 150 mm). Concrete goes on a compacted base, which is usually crushed stone or gravel. Control joints stop random cracking, and a common rule is to space them about 24 to 36 times the slab thickness, which is 8 to 12 ft (2.4 to 3.7 m) for a 4 in slab. Place the concrete before it starts to set, level it, finish it, and then cure it by keeping it damp for several days. In hot or cold weather protect it from drying out too fast or from frost.
Bagged concrete suits a small job. A typical 80 lb (36 kg) bag yields about 0.6 ft³, so the default US slab needs 94 bags, and a 25 kg bag yields about 0.011 m³, so the metric default needs 144. For a job of that size a delivered load is more practical, since mixing 100 bags by hand is slow and the batches vary. Many suppliers have a minimum load or charge extra for a short load. The tool flags jobs under 1 m³ (1.3 yd³) for that reason.
Codes and compliance
Slabs that carry a building, a garage floor or heavy vehicles are regulated, and the rules vary by country. In the US, slab-on-grade floors are covered by the International Residential Code, which commonly sets a minimum thickness of 3½ in, with reinforced concrete designed to ACI 318 from the American Concrete Institute. The National Ready Mixed Concrete Association publishes guidance for ordering ready-mix. In England, ground floors must resist moisture under Approved Document C, and laying more than 5 m² of impermeable paving in a front garden needs planning permission unless the water drains to a lawn or border, as set out in GOV.UK guidance on permeable surfacing of front gardens. Check with your local building department which rules and permits apply. A slab that carries a structure or heavy loads should be designed by a chartered or licensed structural engineer.
Before you order
Tell the supplier the strength class, slump, aggregate size and any admixtures, in the units they use: psi in the US and N/mm² elsewhere. A driveway or an outdoor slab that is exposed to frost is normally specified as air-entrained or with a frost-resistant mix, so ask. Check whether the price is per yd³ or per m³ and whether there is a minimum load or delivery charge. Confirm the access for the truck, whether a pump is needed, the delivery time, and have forms, base and any reinforcement ready before it arrives.
Adjusting the defaults
Every input is editable. Enter your own length, width, thickness, wastage and price, and the result recalculates as you type. The defaults are placeholders, not market prices. Leave the price blank if you only want the volume.
Using this concrete slab calculator alongside other BuildMetricLab tools
The concrete footing, column and steps calculators in the same category cover other pours on a project. Every BuildMetricLab tool runs in your browser with no sign-up and nothing sent to a server, and each one shows its formula so you can check the maths.
Sources & methodology
Net volume = length × width × thickness. Order volume = net volume × (1 + wastage %). Cost = order volume × price per unit volume. Bags = order volume ÷ bag yield, with an 80 lb bag taken as 0.6 ft³ (US) and a 25 kg bag as 0.011 m³. 1 yd³ = 27 ft³ = 0.7646 m³. The ready-mix note flags jobs under 1 m³ (1.3 yd³). Sub-base, reinforcement, joints, curing and structural design are not modelled. A blank length, width, thickness, wastage or price field is refused. Every result is calculated from the values you enter, all inputs are editable, and no time-sensitive prices or rates are embedded.
- American Concrete Institute (ACI): ACI 318 and ACI 302.1R concrete floor and slab construction (US)
- National Ready Mixed Concrete Association (NRMCA, US)
- ASTM C94: Standard specification for ready-mixed concrete (US)
- GOV.UK (England): Site preparation and resistance to moisture, Approved Document C
- GOV.UK (England): Permeable surfacing of front gardens
Frequently asked questions
Are concrete slab calculator results accurate enough to order materials?
Use them as a starting estimate. The volume is exact for the length, width and thickness you enter, but the real figure depends on how level the base is, spillage and how the delivery is measured. Check the quantity with your supplier before ordering.
What wastage percentage should I use?
The calculator defaults to 5%, which suits a level, well-prepared base. Use about 10% or more where the ground is uneven or has low spots, since it takes more concrete than the flat figure suggests. On the default 1.98 yd³ slab, 10% makes 2.17 yd³ instead of 2.07 yd³.
Does this replace professional advice?
No. This tool only produces a planning estimate. A slab that carries a structure, a garage floor or heavy loads should be designed by a chartered or licensed structural engineer, and the work may need a permit. Check the local building rules.
Can I change the unit prices?
Yes. Enter the price per cubic yard (or per m³ on the metric version) from your supplier's quote. The default is a placeholder, not a market price. Leave the price blank if you only want the volume.
Spotted something off?
Calculations or display — let us know.
Related tools
Calculators from other categories that planners often reach for next.