Concrete Footing Calculator
Estimates concrete for strip, spread, and trench footings
Updated May 13, 2026 · Live
What this tool does
Estimates concrete for strip, spread, and trench footings. IRC-compliant footing dimensions.
Calculates cubic yards of concrete required for a footing from its length, width, and depth.
People also use
Formula Used
Formula Used
How the concrete footing calculator works
A strip or trench footing is a long rectangular block of concrete, so its volume is length times width times depth. The calculator multiplies the three, adds a wastage allowance for overdig and spillage, and returns the volume to order: V = L × W × D × (1 + w). It multiplies the result by your price per cubic yard or metre for a cost, and shows the weight of the concrete. It runs in your browser and shows its formula.
The US default is a footing 32 ft long, 2 ft wide and 18 in deep (9.8 m by 0.61 m by 457 mm). That is 32 × 2 × 1.5 = 96 ft³, which is 3.56 yd³. With 5% wastage the order is 3.73 yd³, and at $180 per yd³ it costs $672.00. The metric default is 10 m long, 0.6 m wide and 450 mm deep. That is 10 × 0.6 × 0.45 = 2.70 m³, or 2.84 m³ with 5% wastage, and at 135 per m³ it costs 382.73. Depth has a direct effect, so a footing only 6 in thick over the same 32 ft by 2 ft is 1.19 yd³, a third of the 18 in pour.
Typical concrete and foundations wastage
The default of 5% covers spillage and the concrete left in the chute or pump. A trench footing poured straight into the ground usually needs more, because the trench is never exactly the size you cut it and the sides can collapse or be overdug. 10% is a common allowance for an earth trench, and a trench that is also over-wide needs more again. On the metric default, 10% makes 2.97 m³ instead of 2.84 m³. Bagged concrete is a whole-bag count, so allow about 10% for it.
What this tool does not do
It does not design the footing. It does not tell you how wide or deep a footing should be, which depends on the soil, the loads and the frost depth, and it does not work out reinforcement. It assumes one rectangular section of constant width and depth. Stepped footings, pad footings, corners and changes in section need to be split up and added. It also does not count the trench excavation or the blinding or the sub-base. It is not a quote.
On-site considerations for concrete footing
Enter the thickness of concrete you will pour, not the depth of the trench if only part of it is filled. In some systems the trench is dug deep and filled with masonry up to ground level, so the concrete depth is much less than the hole. Dig the trench to the size your design shows, with the sides cleaned and the bottom level and firm, and check the depth with pegs before the delivery. Compact each pour to remove air, and protect fresh concrete from frost until it has gained strength.
For a small footing, bagged concrete can cost less than a delivered load, because many suppliers have a minimum load or charge extra for a short load. A typical 80 lb (36 kg) bag yields about 0.6 ft³ (0.017 m³). The default footing needs 3.73 yd³, which is 100.8 ft³ and 168 bags, so a delivered load is the practical choice. The tool shows the weight of the pour as well: concrete is taken as 2,400 kg/m³ (150 lb/ft³), so the default is about 6.8 tonnes or 7.5 US tons.
Codes and compliance
Foundations are regulated because they carry the whole building. The rules differ by country and by site. In the US, the International Residential Code sets minimum footing sizes by soil and load, with footings commonly at least 6 in (150 mm) thick, and they must sit below the local frost depth. Reinforced concrete is designed to ACI 318 from the American Concrete Institute, and ready-mix is covered by ASTM C94. In England, strip foundation widths and depths are in Approved Document A, and concrete is specified to BS EN 206 and BS 8500. Frost depth and soil type decide the depth, so ask the local building department what applies. The footing for a house or any loadbearing wall should be designed or checked by a chartered or licensed structural engineer, and the work normally needs an inspection before you pour.
Before you order
Tell the supplier the strength class, slump, aggregate size and any admixtures your design requires, using the units they use: psi in the US and N/mm² elsewhere. Ask whether the price is per yd³ or per m³ and whether there is a minimum load or delivery charge. Check the access for the truck, or whether a pump is needed. Confirm the delivery time, and have the building inspector's visit booked before the concrete arrives, since the trench must stay open for it.
Adjusting the defaults
Every input is editable. Enter your own length, width, depth, wastage and price, and the result recalculates as you type. The defaults are placeholders, not market prices. Leave the price blank if you only want the volume.
Using this concrete footing calculator alongside other BuildMetricLab tools
The concrete slab, column and steps calculators in the same category cover other pours on a project. Every BuildMetricLab tool runs in your browser with no sign-up and nothing sent to a server, and each one shows its formula so you can check the maths.
Sources & methodology
Net volume = length × width × depth. Order volume = net volume × (1 + wastage %). Cost = order volume × price per unit volume. Weight = order volume × 2,400 kg/m³ (150 lb/ft³). 1 yd³ = 27 ft³ = 0.7646 m³. Footing size, reinforcement, frost depth, excavation and structural design are not modelled. A blank length, width, depth, wastage or price field is refused. Every result is calculated from the values you enter, all inputs are editable, and no time-sensitive prices or rates are embedded.
Frequently asked questions
Are concrete footing calculator results accurate enough to order materials?
Use them as a starting estimate. The volume is exact for the length, width and depth you enter, but the real figure depends on the actual size of the trench, overdig, spillage and how the delivery is measured. Check the quantity with your supplier before ordering.
What wastage percentage should I use?
The calculator defaults to 5%, which covers spillage and the concrete left in the chute or pump. Use about 10% for a footing poured straight into an earth trench, where the trench is rarely the exact size you dug, and more if it is over-wide. On the default footing, 10% makes 3.91 yd³ instead of 3.73 yd³.
Does this replace professional advice?
No. This tool is a planning estimate. A footing carries the weight of the building, so its size, reinforcement and depth must be designed or checked by a chartered or licensed structural engineer, and the work normally needs an inspection.
Can I change the unit prices?
Yes. Enter the price per cubic yard (or per m³ on the metric version) from your supplier's quote. The default is a placeholder, not a market price. Leave the price blank if you only want the volume.
Spotted something off?
Calculations or display — let us know.
Related tools
Calculators from other categories that planners often reach for next.