BuildMetricLab

Concrete & Foundations

Concrete Column Calculator

Calculates concrete for round columns, sonotubes and piers by height and diameter

Updated May 13, 2026 · Live

What this tool does

Calculates concrete for round columns, sonotubes and piers by height and diameter.

Calculates total concrete volume for round columns, sonotubes, and piers based on diameter, height, and column count.

Inputs
in
ft
%
$
Result

Total Concrete for 1 Column (incl. 5% wastage)

0.31 yd³

Net Volume per Column (excl. wastage)
0.29 yd³
Columns
1
Estimated Cost
$54.98

Diagram

12 in10 ft
Price it on PlainEstimate

Opens these materials as a new estimate on PlainEstimate, our free estimate and invoice app.

Plain Estimate
From BrightScale Labs
Invoice maker
Quote at the door. Signed on the spot.
Estimates and invoices for trades, built while you are still in the room.
Scan to get
Get it onGoogle Play

People also use

Formula Used
V=π(D2)2⋅H⋅N⋅(1+w)V = \pi \left(\tfrac{D}{2}\right)^2 \cdot H \cdot N \cdot (1 + w)
VV
Total concrete volume
DD
Column diameter
HH
Column height
NN
Number of columns
ww
Wastage allowance (decimal)

How the concrete column calculator works

A round concrete column, pier or tube-formed post is a cylinder, so its volume is the circular cross-section times the height. The calculator takes the diameter, the height, the number of columns and a wastage allowance, and returns the concrete to order: V = π × (D ÷ 2)² × H × N × (1 + w). It multiplies the result by your price per cubic yard or metre for a cost. It works on round columns only; square and rectangular columns need a different calculation. It runs in your browser and shows its formula.

The US default is one column 12 in across and 10 ft high (305 mm by 3.05 m). The cross-section is π × 6² = 113.1 in², or 0.7854 ft², and times 10 ft that is 7.854 ft³, which is 0.291 yd³. With 5% wastage the order is 0.305 yd³, shown as 0.31 yd³, and at $180 per yd³ it costs $54.98. The metric default is one column 300 mm across and 3 m high. That is π × 0.15² × 3 = 0.2121 m³, or 0.2227 m³ with 5% wastage, and at 135 per m³ it costs 30.06.

Diameter has a large effect, because it is squared. Doubling a 12 in column to 24 in quadruples the volume, from 0.29 to 1.16 yd³ for the same 10 ft height. A run of 8 columns of 400 mm diameter and 2.5 m high with no wastage is 8 × 0.3142 = 2.51 m³.

Typical concrete and foundations wastage

The default of 5% covers overfill, spillage, slightly oversize holes and the concrete left in the chute or pump. Pours into earth holes need more than pours into smooth forms, because the hole is rarely the exact size of the tube. Using bags usually calls for about 10%, as the bags are whole units. If you pour into a hole bigger than the form, work out the extra volume or order more.

What this tool does not do

It does not design the column or the footing. It does not work out reinforcement, concrete strength, the depth of a pier below the frost line, or the loads the column will carry, and it does not size an enlarged base or bell at the bottom. It does not count a base slab or cap. It does not allow for the concrete used to fill voids in the sides of the hole. It is not a quote.

On-site considerations for concrete column

Concrete is time-critical. Have enough people ready to place it, compact it and finish it before it starts to set, and plan the pour so the delivery truck is not waiting. Compact each pour to remove air, and keep the form plumb while it is poured. In cold weather, protect fresh concrete from frost until it has gained strength.

For a single small column, bagged concrete can cost less than a ready-mix delivery, because many suppliers have a minimum load or charge extra for a short load. A typical 80 lb (36 kg) bag yields about 0.6 ft³ (0.017 m³) and a 60 lb (27 kg) bag about 0.45 ft³, so check the yield printed on the bag. The default column needs 7.854 × 1.05 = 8.25 ft³, which is 14 bags of 80 lb or 19 bags of 60 lb. At about 10 or more bags, a delivered load is usually easier.

Codes and compliance

Columns carry load, so their design is regulated. The concrete itself and its reinforcement have to be designed to a structural code. In the US, that is ACI 318 from the American Concrete Institute, adopted through the local building code. In the UK and Europe, concrete is designed to Eurocode 2 and specified to BS EN 206 and BS 8500, and in England the structure of a building is covered by Approved Document A. The National Ready Mixed Concrete Association publishes guidance for ordering ready-mix. Frost depths and soil conditions vary by site and local authority. Any column that carries load should be designed by a chartered or licensed structural engineer, and your local building department can tell you whether a permit is needed.

Before you order

Tell the supplier the strength class, slump, aggregate size and any admixtures your engineer specifies, in the units they use: strength in psi in the US and in N/mm² elsewhere. Ask whether the price is per yd³ or per m³ and whether there is a minimum load or delivery charge. Check the access for the truck, or whether a pump is needed. Confirm the delivery time and have the forms and reinforcement checked before the concrete arrives.

Adjusting the defaults

Every input is editable. Enter your own diameter, height, number of columns, wastage and price, and the result recalculates as you type. The defaults are placeholders, not market prices. Leave the price blank if you only want the volume.

Using this concrete column calculator alongside other BuildMetricLab tools

The concrete footing, concrete steps and concrete slab calculators in the same category cover other pours on a project. Every BuildMetricLab tool runs in your browser with no sign-up and nothing sent to a server, and each one shows its formula so you can check the maths.

Sources & methodology

Volume per column = π × (diameter ÷ 2)² × height. Total = volume per column × number of columns × (1 + wastage %). Cost = total × price per unit volume. 1 yd³ = 27 ft³ = 0.7646 m³. Round columns only. Reinforcement, concrete strength, footings, bells, frost depth and structural design are not modelled. A blank diameter, height, count or wastage field is refused, and the number of columns must be a whole number. Every result is calculated from the values you enter, all inputs are editable, and no time-sensitive prices or rates are embedded.

Frequently asked questions

Are concrete column calculator results accurate enough to order materials?

Use them as a starting estimate. The volume is exact for the diameter, height and count you enter, but the real figure depends on the actual size of the hole or form, spillage and how the delivery is measured. Check the quantity with your supplier before ordering.

What wastage percentage should I use?

The calculator defaults to 5%, which covers overfill, spillage and the concrete left in the chute or pump. Use more for a pour into an earth hole, where the hole is rarely the exact size of the tube, and about 10% for bagged concrete. On the default column, 5% makes 0.305 yd³ instead of 0.291 yd³.

Does this replace professional advice?

No. This tool provides a planning estimate only. A concrete column carries load, so its size, reinforcement and footing must be designed by a chartered or licensed structural engineer, and the work may need a permit.

Can I change the unit prices?

Yes. Enter the price per cubic yard (or per m³ on the metric version) from your supplier's quote. The default is a placeholder, not a market price. Leave the price blank if you only want the volume.

Spotted something off?

Calculations or display — let us know.

Calculators from other categories that planners often reach for next.