BuildMetricLab

Concrete & Foundations

Floor Screed Calculator

Counts the bags of screed mix for a floor, and checks the depth for the screed type

Updated September 29, 2026 · Live

What this tool does

Works out the volume and bags of sand and cement screed mix for a floor from its area and depth, with a waste allowance, and checks the depth against the minimum for bonded, unbonded and floating screeds.

Area × depth plus waste, converted at 1930 kg of dry mix per m³ (published bag yields) into whole bags, with a minimum-depth check for the screed type.

Inputs
ft²
in
lb
%
$
Result

80 lb Bags of Screed

60

Screed Volume (inc. waste)
1.46 yd³
Dry Mix Weight
2.37 tons
Area Covered
215.0 ft²
Depth for Unbonded (on a membrane)
At least 2 in: OK
Estimated Cost
$480.00
Price it on PlainEstimate

Opens these materials as a new estimate on PlainEstimate, our free estimate and invoice app.

People also use

Formula Used
Bags of screed mix
Floor area (ft², used in m²)
Screed depth (in, used in m)
Waste allowance (decimal)
Dry mix per m³ of screed: 1930 kg (about 120 lb/ft³)
Bag weight (lb, used in kg)

How the floor screed calculator works

A screed is the sand and cement layer laid over a concrete base to give a flat, level surface for the floor finish. This calculator is for bagged screed mix. It works out the volume from the area and depth, adds your waste allowance, converts the volume to dry mix by weight and rounds up to whole bags:

N = ⌈A × d × (1 + w) × 1930 ÷ b⌉

A is the area, d the depth, w the waste as a decimal, b the bag weight in kg, and 1930 the kilograms of dry mix that make one cubic metre of laid screed. It also checks the depth against the minimum for the kind of screed you are laying.

Where 1930 kg per cubic metre comes from

Bag makers print a yield on the bag. The Quikrete Sand/Topping Mix data sheet gives about 0.66 ft³ (18.7 L) from an 80 lb (36.2 kg) bag and 13 L from a 25 kg bag. Both work out at close to 1930 kg of dry mix per cubic metre of screed. If your bag states a different yield, divide the volume by it instead; the difference between products is usually a few percent.

Worked through

With the metric defaults, 20 m² at 50 mm is 1.0 m³. Add 10% and it is 1.1 m³, which needs 1.1 × 1930 = 2123 kg of mix, or 85 bags of 25 kg. At £6 a bag that is £510. In US units, 215 ft² at 2 in is 35.8 ft³, or 39.4 ft³ with 10% added; at 0.66 ft³ per 80 lb bag that is 60 bags. A floating screed over underfloor heating insulation, 30 m² at 65 mm, comes to 2.15 m³ with waste, 4.1 tonnes of mix and 166 bags.

Numbers like that are why larger floors are usually laid with ready-mixed or pumped screed delivered by the tonne. Eighty-odd bags is roughly two tonnes to carry, mix and place in one working window.

How thick the screed has to be

Thickness depends on what the screed sits on. According to The Concrete Society's guidance on screeds, a sand and cement screed bonded to the concrete base works best at 25 to 40 mm (1 to 1 9/16 in). An unbonded screed, laid on a membrane, should be at least 50 mm (2 in). A floating screed, laid on insulation such as the boards under wet underfloor heating, should be more than 65 mm (2 9/16 in) for lightly loaded floors and 75 mm (3 in) for more heavily loaded ones, and 65 mm only works if the insulation is firm enough to compact the screed against. Pick the screed type and the calculator flags a depth below the minimum, or a bonded screed thicker than the 25 to 40 mm range.

Measure the depth at several points across the room before ordering. Bases are rarely flat, and a floor that is 50 mm at one wall and 70 mm at the other needs the average, not the thinnest reading. The simplest way is to mark a level line around the walls at the height of the finished screed, then measure down from it to the base on a rough grid, every metre or so, and at the doorways where the screed has to meet the next floor. Average those readings for the depth, and note the thinnest one: it is the reading to check against the minimum for the screed type. If the thinnest point falls short, the answer is usually to lower the finished level or deal with the high spot in the base, not to screed thinner there.

Before the floor finish goes down

A screed is not ready for flooring when it can be walked on. The water has to leave, and the accepted test is the hygrometer box: a sealed, insulated box on the surface that measures the humidity of the trapped air once it settles. Contract Flooring Journal notes that a maximum of 75% relative humidity by this method is acceptable for most floor finishes, while the flooring maker's own figure still applies, and Floorscape's moisture testing guide lists the British Standards that reference the method. Wood and moisture-sensitive finishes often ask for a lower reading.

What this tool does not do

It does not design mixes for site-mixed screed, size the screed for heavy or industrial loads, or check the base for movement. Self-levelling and flowing screeds use different bags and depths; follow their own data sheets. Underfloor heating, insulation and membranes follow the heating and insulation makers' details.

Using this calculator with other BuildMetricLab tools

The concrete slab calculator sizes the base beneath, the concrete mix ratio calculator helps if you batch the base yourself, and the tile calculator counts the finish. All BuildMetricLab tools run in your browser with no sign-up, and the formula is on the page so the maths can be checked.

Sources & methodology

Bags = ⌈area × depth × (1 + waste) × 1930 kg/m³ ÷ bag weight⌉. 1930 kg of dry mix per m³ of laid screed from Quikrete Sand/Topping Mix yields (0.66 ft³ from 80 lb; 13 L from 25 kg). Depth checks from The Concrete Society: bonded 25-40 mm optimum, unbonded at least 50 mm, floating over 65 mm (light loads) or 75 mm (heavier loads). Moisture before flooring: hygrometer box, 75% RH typical maximum (Contract Flooring Journal; Floorscape).

Frequently asked questions

Are floor screed calculator results accurate enough to order materials?

Close enough to order bags, provided the depth is right. The count uses about 1930 kg of dry mix per cubic metre, from published bag yields; if your bag states a different yield, the count moves by a few percent. Measure the depth at several points and use the average, since uneven bases are the usual cause of running short.

What wastage percentage should I use?

The default is 10%, which covers spillage, mix left in the mixer and small dips in the base. Use more if the base is noticeably out of level or the room has lots of corners and doorways, and less for a small, flat, square room.

Does this replace professional advice?

No. It is a planning estimate. Screeds over underfloor heating, on suspended floors or carrying heavy loads need the heating, insulation or structural designer's details, and floor finishes need their maker's moisture limits met before laying.

Can I change the unit prices?

Yes. Enter the bag weight and price from your supplier and the calculator counts and prices whole bags of that size. For large floors, compare the result with a quote for ready-mixed screed by the tonne.

How thick should a screed be?

The Concrete Society gives 25 to 40 mm (1 to 1 9/16 in) for a sand and cement screed bonded to the base, at least 50 mm (2 in) unbonded on a membrane, and more than 65 mm (2 9/16 in) floating on insulation for lightly loaded floors, or 75 mm (3 in) for heavier loads. Choose the screed type and the calculator checks your depth against it.

When can I lay flooring on a new screed?

When a hygrometer box test shows the screed is dry enough, typically 75% relative humidity or lower for most finishes, and lower where the flooring maker asks for it. Walking on it early is not the same as it being ready for flooring.

Spotted something off?

Calculations or display — let us know.

Calculators from other categories that planners often reach for next.