Concrete & Foundations
Concrete Mix Ratio Calculator
Calculates cement, sand, gravel ratios for custom mix concrete
Updated May 13, 2026 · Live
What this tool does
Calculates cement, sand, gravel ratios for custom mix concrete. Common 1:2:3 and 1:2:4 mixes.
What this tool does not check
- Not a designed mix — does not specify strength class, cement type, or workability.
- Not suitable for reinforced concrete, foundations, or structural slabs.
- Does not check water-cement ratio, durability class, or exposure.
People also use
Formula Used
Formula Used
How the concrete mix ratio calculator works
A traditional site mix is described by parts, such as 1:2:4, which is one part cement to two parts sand to four parts coarse aggregate, measured by volume. The calculator turns a volume of finished concrete into quantities of the three materials. The parts are dry, loose volumes, and they pack down once they are wet, so more dry material goes in than comes out. The rule of thumb is that 1 m³ of wet concrete needs about 1.54 m³ of dry materials: cement = 1.54 × V × c ÷ (c + s + a), and the same for sand and aggregate with their own parts. It then converts volumes to weights using bulk densities of 1,440 kg/m³ for cement, 1,600 for sand and 1,500 for aggregate. It runs in your browser and shows its formula.
For 1 m³ of 1:2:4 concrete, the 7 parts make 1.54 m³ of dry material, so one part is 0.22 m³. Cement is 0.22 m³, or 317 kg, which is 13 bags of 25 kg. Sand is 0.44 m³ (704 kg), and aggregate is 0.88 m³ (1.32 tonnes). The tool also shows about 180 L of water. The US default is a 1:2:3 mix for 1.3 yd³ (about 1 m³). Here one part is 1.54 ÷ 6 = 0.2567 of the volume, so the tool gives 810 lb of cement, which is 9 bags of 94 lb, plus 0.67 yd³ of sand and 1.00 yd³ of aggregate. A richer mix takes more cement: 1:2:3 for 1 m³ needs 370 kg, against 317 kg for 1:2:4.
Typical concrete wastage
The quantities are net amounts for the volume you enter, with no allowance for spillage, over-excavation or batching losses. Add 5 to 10% to the volume you enter, and more for hand mixing, an earth trench or an awkward pour. On 1 m³, 10% means entering 1.1 m³, which gives 349 kg of cement. Round the bags up to whole bags, and aggregate and sand up to the way your supplier delivers them, by the bulk bag or by the tonne.
What this tool does not do
It does not choose the mix for you or tell you its strength. It assumes the bulk densities listed above, which vary with moisture and grading, especially for damp sand that has bulked. It does not design the concrete for structural use, and it does not include reinforcement or admixtures. The water figure is an approximation of about 180 L per m³, and the right amount depends on how wet the sand is. It is not a quote.
On-site considerations for concrete mix ratio
Site mixes by volume suit small, non-structural jobs such as bases, paths and small slabs. They need accurate gauging, so measure the parts with the same bucket or box, and keep the water low, because too much water weakens the concrete. Mix until the colour is even, place it before it starts to set, and compact and cure it. For larger or structural pours, a ready-mix supplier can batch a designed mix to a stated strength, which is more reliable than a site mix.
Wet cement is alkaline and can burn skin and eyes. Wear gloves, eye protection and waterproof clothing, wash splashes off at once, and avoid breathing the dust when you open bags.
Codes and compliance
Structural concrete is specified by strength class, not by volume ratio, and the rules vary by country. In the US, concrete for buildings is designed to ACI 318 from the American Concrete Institute, and ready-mix is covered by ASTM C94. The American Cement Association publishes technical guidance on cement and concrete. In the UK and Europe, concrete is specified to BS EN 206 and BS 8500, and the Concrete Society provides guidance. Frost depths and soil conditions vary by site and local authority. Anything that carries load should be designed by a chartered or licensed structural engineer, and your local building department can tell you whether a permit or inspection is needed.
Before you order
Check the bag size, since cement is sold in 25 kg bags in many countries and 94 lb (42.6 kg) bags in the US. Ask whether sand and aggregate are sold by the tonne, the cubic yard or the bulk bag, and check that the aggregate size suits the job: 20 mm (3/4 in) is common for general work, and a smaller size for thin sections. Keep cement dry and off the ground. Compare the cost of the materials, the mixing and the delivery with a ready-mix load, because for anything above a few bags the ready-mix is often easier and more consistent.
Adjusting the defaults
Every input is editable. Enter your own volume and the parts of cement, sand and aggregate, and the result recalculates as you type. The defaults are common site mixes, not recommendations, so use the mix your design or supplier specifies.
Using this concrete mix ratio calculator alongside other BuildMetricLab tools
The rebar, mortar and cement bags calculators in the same category cover other parts of a concrete job. Every BuildMetricLab tool runs in your browser with no sign-up and nothing sent to a server, and each one shows its formula so you can check the maths.
Sources & methodology
The mix parts are dry, loose volumes. Dry material volume = wet concrete volume × 1.54 (the rule-of-thumb bulking factor, because dry materials pack down once water is added). Each material's dry volume = 1.54 × V × its parts ÷ total parts. Weights use bulk densities of 1,440 kg/m³ for cement (90 lb/ft³), 1,600 kg/m³ for sand and 1,500 kg/m³ for coarse aggregate. Cement bags are 25 kg, or 94 lb (42.6 kg) on the US page. Water is about 180 L per m³ of concrete. Moisture bulking of damp sand, spillage, admixtures, reinforcement and structural design are not modelled. A blank or zero volume or mix part is refused. Every result is calculated from the values you enter, all inputs are editable, and no time-sensitive prices or rates are embedded.
Frequently asked questions
Are concrete mix ratio calculator results accurate enough to order materials?
Use them as a starting estimate. The quantities are exact for the volume and mix parts you enter, using standard bulk densities and a dry-to-wet factor of 1.54, but the real amounts depend on the moisture and grading of the sand and aggregate. Check the quantities with your supplier before ordering.
Should I add extra material for waste and spillage?
Yes. The calculator gives the net quantities for the volume and mix ratio you enter, with no allowance for spillage, over-excavation or batching losses. Add 5-10% to the volume, and more for hand mixing, an earth trench or an awkward pour. For 1 m³ of 1:2:4, entering 1.1 m³ makes 349 kg of cement instead of 317 kg.
Does this tool replace advice from a licensed contractor or engineer?
No. This tool is a planning estimator. A site-mixed volume ratio does not give a stated strength, so concrete that carries load should be a designed mix, specified and checked by a chartered or licensed structural engineer.
Can I use a different mix ratio than 1:2:3?
Yes. Enter any custom cement, sand and aggregate parts (for example 1:2:3, 1:2:4 or 1:3:6) and the calculator splits the dry volume proportionally between the three materials. A richer mix has more cement: for 1 m³, 1:2:3 needs about 370 kg and 1:2:4 about 317 kg.
Spotted something off?
Calculations or display — let us know.