Painting & Decorating
Painting Cost Calculator
Painting cost from area, an all-in rate, contingency and tax
Updated October 1, 2026 · Live
What this tool does
Estimates what painting a room or house will cost from the area, an all-in rate per square foot or square metre that you can replace with a quote, a contingency percentage and tax. The default rate is for interior rooms.
Multiplies the area by the rate, adds contingency, then tax, and shows each step.
People also use
Formula Used
Formula Used
How the painting cost calculator works
Painters price interior work by the area they cover, so the calculator does the same. It multiplies the area you enter by an all-in rate per square foot or square metre. It then adds a contingency percentage for the things that only turn up once the furniture is moved, and tax if you tell it to. Nothing in the rate is fixed. The default stands in for a mid-range interior job, walls prepared and given two coats; a quote, once you have one, replaces it.
The default US case is 540 ft² at $3.30 a square foot: 540 × 3.30 = $1,782, plus 10% contingency is $1,960.20, and with sales tax left at 0% that is the total. The metric default is 50 m² at £35: 50 × 35 = £1,750, plus 10% is £1,925, and with VAT at 20% the total is £2,310. Put a 7% sales tax on the US figure and it becomes $2,097.41, because the tax is charged on the contingency as well as the base. On the metric side the currency symbol follows your browser's language, but the 35 and the 20% are UK figures: in Australia enter a local rate and 10% GST, in Canada the GST or HST for your province.
Where the rate comes from
A per-area rate is really four numbers rolled into one: paint, labour, preparation and the painter's overhead and margin. You can rebuild it to see whether a quote is fair. Take the paint first. Dulux Trade Vinyl Matt is rated at up to 17 m² a litre, and most US labels quote about 350 to 400 ft² a gallon. Real walls take more than the label figure. UK trade emulsion is usually planned at 12 m² a litre and US wall paint at about 350 ft² a gallon, which is 8.6 m² a litre; the two differ because the products do, not because of the units. Two coats on 50 m² at 12 m² a litre is 8.3 litres, so four 2.5 litre tins, £96 at the paint calculator's default of £24 a tin. Two coats on 540 ft² at 350 ft² a gallon is 3.1 gallons, so four gallons, about $152 at its default of $38 a gallon.
Labour is the larger share. The painting time calculator's default is 0.45 hours per 100 ft² for two coats of rolling, which makes 540 ft² about 2.4 hours; cutting in, masking and moving furniture take about as long again, so call it five hours. In the US the Bureau of Labor Statistics puts the median painter's wage in the mid-twenties of dollars an hour. A contractor's charge-out rate, with insurance, overhead and profit, is usually about double the wage, so call it $50 an hour; five hours is $250. Paint and labour together come to about $400, or 74 cents a square foot. The default $3.30 is nearly four and a half times that, and the gap is the rest of the job: filling and sanding, masking, ceilings and woodwork, and a second visit. The UK version of the same sum uses the sibling tool's 0.05 hours per m² at £24 an hour. 50 m² is 2.5 hours of rolling, five hours all told, so £120; with £96 of paint that is about £216, or £4.30 a square metre against the £35 default. A plain two-coat repaint of sound walls in a room you have cleared can sit near the low figure; a full decoration with repairs sits near the default or above it. A decorator who quotes a day rate is giving you the same number by another route: divide the day rate by the area they expect to finish in a day.
Measuring the area
Measure each wall, length times height, and add them up. Take off doors, windows and fitted cabinets, but leave anything smaller than a door in, because cutting in around it takes longer than painting over it would have. If a quote is per room rather than per area, divide it by your measured area before you compare it with the default. In the US, a quote per square foot is often per square foot of floor, not wall. A room's walls come to roughly two and a half to three times its floor area, so check which the quote means before you divide. Two coats do not double the area: the rate already assumes a two-coat finish, so enter the surface once.
The same arithmetic works for the outside of a house, but not the same rate. Exterior work carries access equipment, weather delays, more preparation and masonry or wood coatings that cover less, so exterior quotes per area run well above interior ones. Measure the elevations, take off the windows and doors, and enter an exterior quote divided by its area rather than the default, which is for rooms.
Contingency, tax and what the rate leaves out
Contingency covers the cracked plaster or drywall behind a picture and the extra coat a strong colour change needs. 10% is usual for redecoration; use 15% in an older house. Tax depends on where you are. In the UK a VAT-registered decorator adds 20% to the whole job. Australia adds 10% GST and Canada 5% to 15% GST or HST depending on the province. In most US states the painter pays sales tax on the paint and builds it into the quote, and labour is not taxed. The tax field therefore starts at 0 with US units and at the UK's 20% with metric; set it to the rate on your quote, or to 0 if the quote already includes tax.
The rate does not include scaffolding or towers for stairwells and tall walls, plaster repairs beyond filling, or lead-safe working. In the US, work that disturbs paint in a home built before 1978 falls under the EPA's Renovation, Repair and Painting rule, which requires a certified firm and lead-safe practices, and that adds to the price. In the UK, solvent content is limited by the VOC in Paints Regulations 2012, which is why trade emulsions are water-based and why a solvent-based finish on woodwork costs more and needs ventilation.
Application conditions and drying time
Water-based paints have an application window, usually 10°C (50°F) and above with the humidity below about 80%, and the data sheet gives the figures for your product. Wall paint is recoatable in two to four hours, so two coats fit one working day. Woodwork finishes often need overnight between coats, which is one reason a job with lots of trim costs more for its area than one without.
Using this with other BuildMetricLab tools
The paint calculator turns the same area into tins or gallons and prices them. The primer calculator does the same for a first coat on new surfaces, and the painting time calculator turns the area into hours. All BuildMetricLab tools run in your browser with no sign-up, and the formula is on the page so the maths can be checked.
Sources & methodology
Cost = area x rate x (1 + contingency%) x (1 + tax%). The rate is an all-in figure per ft² or m² for labour, paint, preparation and margin; the default is an interior starting figure that a quote divided by its area replaces. Contingency is applied to the base cost; tax to base plus contingency. No paint quantities are calculated.
- Dulux Trade: Vinyl Matt technical information (coverage up to 17 m² per litre, recoatable 2 to 4 hours)
- US EPA: Lead Renovation, Repair and Painting (RRP) rule for homes built before 1978
- legislation.gov.uk: Volatile Organic Compounds in Paints, Varnishes and Vehicle Refinishing Products Regulations 2012
- US Bureau of Labor Statistics: Painters, Construction and Maintenance (Occupational Outlook Handbook, median pay)
Frequently asked questions
Are painting cost calculator results accurate enough to order materials?
They are a budget figure, not a materials list. The total is your area times your rate, so it is only as good as the rate; a written quote divided by its area is the best input. To order paint, use the paint calculator, which works from coverage and coats and prices the tins.
What rate should I enter?
Your painter's quote divided by the area it covers. Without a quote, the default is an interior figure for a full room decoration with two coats; a plain repaint of sound walls can come in at a quarter of it, and exterior work, repairs, high ceilings or lots of woodwork push it higher. Contingency is a separate input, so do not pad the rate for surprises.
Does this replace professional advice?
No. It is a planning estimate. Get written quotes before committing, and remember that some work changes the price in ways no rate captures: lead-safe practices in a pre-1978 US home under the EPA RRP rule, access equipment for tall walls and exteriors, and repairs to the surface itself.
Can I change the unit prices?
Yes. The rate per square foot or square metre, the contingency and the tax percentage are all inputs; change any of them and the total is recalculated.
Spotted something off?
Calculations or display — let us know.
Related tools
Calculators from other categories that planners often reach for next.













