Floor Joist Calculator

Floor joist count, cut length, rim joists and strutting from spacing and span

Updated October 2, 2026 · Live

What this tool does

Counts the floor joists for a room from the length across the joists and the spacing, and gives each joist's cut length from the span plus bearing. It also totals the length and cost and adds the rim joists and mid-span strutting the floor needs.

Counts the joists spread along a bearing wall, adds bearing to the span for each joist's length, totals the timber and cost, and adds rim joists and strutting.

Inputs
ft
ft
in
$
Result

Joists Required

13

Spacing
16 in
Joist Support
1 1/2 in bearing each end
Cut Length
12.25 ft (12 ft 3 in)
Total Joist Length
159.25 ft
Rim Joists (optional)
32.00 ft
Bridging (IRC R502.7.1)
1 row if joists are deeper than 2x12, about 16.0 ft of blocking
Size Check
IRC Table R502.3.1(1) or (2), or AWC span tables
Estimated Cost (joists only)
$286.00

Diagram

16 ft
Price it on PlainEstimate

Opens these materials as a new estimate on PlainEstimate, our free estimate and invoice app.

Plain Estimate
From BrightScale Labs
Invoice maker
Quote at the door. Signed on the spot.
Estimates and invoices for trades, built while you are still in the room.
Scan to get
Get it onGoogle Play

What this tool does not check

  • Does not size the joist (depth, width, grade) for the span or load.
  • Does not check deflection, bearing capacity, notching, or point loads.
  • Does not verify fire resistance or acoustic separation between dwellings.

People also use

Formula Used
N=⌈Ls⌉+1,ℓ=S+2bN = \left\lceil \frac{L}{s} \right\rceil + 1,\quad \ell = S + 2b
NN
Joists required
LL
Length across the joists (ft)
ss
Joist spacing, centre to centre (in, converted to ft)
SS
Joist span (ft)
ℓ\ell
Cut length of each joist
bb
Bearing added at each end for the support chosen (negative for hangers)

How the floor joist calculator works

Floor joists run from one bearing wall or beam to the next and are spaced out along the walls they sit on. Two lengths matter, and they are easy to mix up. The span is how far each joist reaches, support to support. The length across the joists is the distance along the bearing wall that the joists are spread over, and that is what sets how many you need. The calculator takes both: the length across the joists for the count, the span for the length of each joist.

The count is N = ⌈L ÷ s⌉ + 1, where L is the length across the joists and s the spacing between their centres. Dividing gives the number of gaps, rounded up so the last gap is never wider than the spacing, and the extra one closes the far end. Each joist is cut to the span plus its bearing at both ends. The total length and the cost follow from the count, and the card adds the rim joists along the bearing walls and the strutting a longer span needs.

Bearing at each end

Section R502.6 of the International Residential Code, Chapter 5 requires each joist to have at least 1 1/2 in (38 mm) of bearing on wood or metal and 3 in (76 mm) on masonry or concrete. A joist in an approved hanger needs no bearing of its own. The bearing selector sets the cut. On a timber sill or wall plate the calculator adds 1 1/2 in (38 mm) at each end, so a 12 ft span gives joists 12 ft 3 in long (12.25 ft) and a 3.6 m span gives 3.68 m. Built into masonry it adds 3 in on the US side and 100 mm on the metric side, the minimum in Lancaster City Council's building control note on domestic timber floors, so the 3.6 m joist becomes 3.80 m. In hangers the joist is the clear span, wall face to wall face, cut up to 1/4 in (6 mm) short so it drops in; the Lancaster note allows 6 mm overall. That gives 3.59 m (3.594 m before rounding) for the same room. Measure the actual positions on site before cutting.

Worked examples

A room 16 ft along its bearing walls with joists at 16 in centres: 16 ft is 192 in, 192 ÷ 16 = 12 gaps, so 13 joists. With a 12 ft span each is 12.25 ft, 159.25 ft in all, and two rim joists add 32 ft. At 19.2 in centres along the same 16 ft, 192 ÷ 19.2 = 10 gaps and 11 joists. When the length does not divide exactly the count rounds up: 13 ft at 16 in is 156 ÷ 16 = 9.75, so 10 gaps and 11 joists, and the last gap comes out at 12 in.

In metric, 4 m along the wall at 400 mm centres is 10 gaps and 11 joists, and with a 3.6 m span each is 3.68 m (3.676 m before rounding), so 40.44 m of joist. At 600 mm centres along 5.2 m, 5.2 ÷ 0.6 = 8.67, so 9 gaps and 10 joists, and a 4.8 m span puts the floor in the two-rows-of-strutting band.

Choosing the spacing

Floor joists are set out at 12, 16, 19.2 or 24 in in North America and 400, 450 or 600 mm in the UK, Australia and New Zealand. These are the modules the floor sheets are made to: a 4 × 8 ft sheet lands on a joist every 16 or 19.2 in, and a 2400 × 600 mm chipboard panel every 400 or 600 mm. Wider spacing means fewer joists, but each carries more, so it has to be deeper for the same span, and the floor deck has to be thicker. Closer spacing with a shallower joist is often the way to gain ceiling height below.

Size is a separate check

Nothing here checks whether the joist is big enough. The IRC gives maximum floor joist spans by species, grade, size and spacing in Table R502.3.1(1) for sleeping areas and attics (30 psf live load) and Table R502.3.1(2) for the rest of the house (40 psf). At 16 in centres under a 40 psf living area with a 10 psf dead load, spruce-pine-fir No. 2 spans 12 ft 3 in as a 2×8 and 15 ft 5 in as a 2×10. The 12 ft example above just works in 2×8; add a heavier floor finish and the 20 psf dead load column drops the 2×8 to 11 ft 6 in, so it needs 2×10. In the UK the same check is done from the TRADA span tables for C16 or C24 timber. The Lancaster note reproduces them: a 195 × 47 mm C16 joist at 400 mm centres spans at most 4.07 m. The American Wood Council's span tables and calculator cover the other species and grades. Other countries publish their own: Canada's are in Part 9 of the National Building Code, Australia's in AS 1684 and New Zealand's in NZS 3604. In England, Approved Document A sets the structural requirements and points to the span tables published by TRADA; a structural engineer or building control officer can confirm the size.

Rim joists, strutting and doubles

A platform-framed floor has a rim joist, also called a header or band joist, nailed across the joist ends along each bearing wall. The card adds two lengths equal to the length across the joists for it. In UK masonry construction the joists more often sit in hangers or are built into the wall and there is no rim joist, so treat that row as optional.

Long joists need holding upright at mid-span. IRC section R502.7.1 requires solid blocking, diagonal bridging or a strip across the bottom at intervals of 8 ft or less, but only for joists deeper than a nominal 2×12; most crews block shallower joists too. UK practice, set out in NHBC Standards clause 6.4.15 and in the Lancaster note, is a row of herringbone or solid strutting at mid-span for spans from 2.5 m to 4.5 m. Over 4.5 m it is two rows, at the third points. The card reports the rows and a length of strutting equal to the rows times the length across; herringbone, with two diagonals in each bay, uses about twice that.

The count does not include doubled joists under bearing walls that run parallel to them (IRC R502.4; UK building control asks for the same, and for extra joists under a bath). Nor does it include the header and trimmer joists around a stair or hatch opening (R502.10, doubled where the header spans more than 4 ft), or hangers, straps and fixings. Add those from the framing plan, and a spare or two for bowed or split stock.

Using this with other BuildMetricLab tools

The lumber calculator turns the joist lengths into stock lengths and board feet, the deck framing calculator does the same job for an outdoor deck, and the ceiling joist calculator covers the ceiling above. All BuildMetricLab tools run in your browser with no sign-up, and the formula is on the page so the maths can be checked.

Sources & methodology

Joists = ceil(length across the joists / spacing) + 1. Cut length = span + 2 x bearing. Bearing is 38 mm (1 1/2 in on US-units pages) on a timber plate per IRC R502.6, or 100 mm (3 in on US-units pages) built into masonry; in hangers the cut is the span less 6 mm (1/4 in). Total joist length = joists x cut length; cost = joists x price. Rim joists = 2 x length across. Bridging rows (US units) = ceil(span / 8 ft) - 1, required by IRC R502.7.1 only for joists deeper than 2x12. Strutting rows (metric) = 1 for spans from 2.5 m to 4.5 m, 2 over 4.5 m, per NHBC Standards 6.4.15; strutting length = rows x length across. Joist size is not checked.

Frequently asked questions

Are floor joist calculator results accurate enough to order materials?

For the count and cut length, yes, provided the length across the joists and the span are measured on site and the joist support matches how the ends are carried. Add doubled joists under parallel walls, header and trimmer joists around any opening, and a spare or two for bowed or split stock, and confirm the joist size separately from the span tables.

Does this calculator account for waste or extra joists?

It rounds the raw count up to a whole number of gaps and adds one joist to close the far end, which is the geometry, not a waste allowance. Timber comes in stock lengths, so the offcut from each joist is the difference between the stock length and the cut length. Trimmers, doubles and damaged stock are not included; add them from the framing plan.

Does this tool substitute for professional advice?

No. It counts and cuts joists; it does not size them. Joist size must come from the floor span tables for your country, such as IRC Table R502.3.1 in the US, or from a structural engineer, and most places inspect floor framing before it is covered.

Can I change the unit prices?

Yes. The price per joist is an input; enter the price for the size and length you are buying, and the cost is recalculated from the count. Rim joists and strutting are shown as lengths and are not priced.