BuildMetricLab

Drainage & Earthworks

Weeping Tile Calculator

Weeping tile pipe, clear stone by volume and weight, cover over the pipe and filter fabric for a footing perimeter drain

Updated October 10, 2026 · Live

What this tool does

Works out the perforated pipe for a foundation perimeter drain from the footing perimeter and an allowance for corners and risers, the clear stone around it from the trench width and depth, the weight of that stone at a bulk density you set, the depth of stone over the pipe against the 150 mm (6 in) the Canadian and US codes ask for, and the filter fabric to wrap it. Shows every figure in metric and US units.

Perimeter plus an allowance for the pipe; perimeter times trench width times depth for the stone.

Inputs
ft
in
in
in
%
lb/ft³
$/ft
Result

4.0 in Perforated Pipe Required

137 ft

Pipe (perimeter + 5%)
136.5 ft (41.6 m)
Clear Stone (12.0 in × 12.0 in trench)
4.81 yd³ (3.68 m³)
Stone Weight at 1.60 t/m³
6.50 US tons (5.90 t)
Stone Over the Pipe
8.0 in, meets the 150 mm (6 in) over the pipe the codes ask for
Filter Fabric (no laps)
390 ft² (36.2 m²)
Estimated Pipe Cost
$170.62
Before Laying
Pipe on undisturbed or compacted ground, top below the slab, falling to a sump or daylight; stone wrapped in filter fabric
Price it on PlainEstimate

Opens these materials as a new estimate on PlainEstimate, our free estimate and invoice app.

Plain Estimate
From BrightScale Labs
Invoice maker
Quote at the door. Signed on the spot.
Estimates and invoices for trades, built while you are still in the room.
Scan to get
Get it onGoogle Play

People also use

Formula Used
L=P(1+a),V=P⋅w⋅d,c=d−DL = P (1 + a), \quad V = P \cdot w \cdot d, \quad c = d - D
LL
Perforated pipe length
VV
Clear stone volume
cc
Stone cover over the pipe
PP
Footing perimeter (ft)
aa
Allowance as a decimal (5% = 0.05)
ww
Trench width (in)
dd
Gravel depth (in)
DD
Pipe diameter (in)

How the weeping tile calculator works

Weeping tile is the perforated pipe laid beside the footing all the way round a basement, so the pipe is the footing perimeter plus an allowance for the corners, the fittings and the risers to a cleanout, and the stone is the perimeter times the cross-section of the bed around the pipe. The calculator does both, then adds what the stone weighs and how much filter fabric wraps it. The rules it checks against are the Canadian ones, since this started as a Canadian tool: Section 9.14.3 of Part 9 of the National Building Code, reproduced word for word in the Vancouver Building By-law 2019, says the pipe "shall be not less than 100 mm in diam.", that it "shall be laid on undisturbed or well-compacted soil so that the top of the tile or pipe is below the bottom of the floor slab", and that "the top and sides of drain pipe or tile shall be covered with not less than 150 mm of crushed stone or other coarse clean granular material containing not more than 10% of material that will pass a 4 mm sieve". The US rule is the same shape: the International Residential Code, as published on UpCodes (Virginia IRC 2021, R405.1), puts drains "at or below the top of the footing or below the bottom of the slab", on at least 2 in (51 mm) of washed gravel or crushed rock, with at least 6 in (152 mm) over the top and a filter membrane.

The metric default is a 40 m footing with a 300 by 300 mm bed of clear stone and 100 mm pipe: 42.0 m (137.8 ft) of pipe with the 5% allowance, 3.60 m³ (4.71 yd³) of stone weighing 5.76 t at 1.6 t/m³, 200 mm of stone over the pipe, and 36.0 m² of fabric before laps. The US default is a 130 ft footing with a 12 by 12 in bed and 4 in pipe: 136.5 ft (41.6 m) of pipe, 4.81 yd³ (3.68 m³) of stone weighing 6.50 US tons, 8 in of stone over the pipe, and 390 ft² of fabric. Both beds clear the 150 mm (6 in) cover; a 10 in bed over a 4 in pipe gives exactly 6 in, and a 200 mm bed over a 100 mm pipe gives 100 mm, which the Stone Over the Pipe row flags.

What weeping tile does

A perimeter drain is a relief valve. Water in the ground beside a basement wall pushes on the wall and the floor, finds the joint between footing and slab, and comes in; a pipe at footing level in a bed of open stone gives it an easier path, and a sump or a fall to daylight takes it away. That is why the pipe has to sit at the footing and not above it, why the stone has to be clean, and why the system is only as good as its outlet. The Alberta county of Rocky View puts the whole thing on one page in its foundation drainage guideline: pipe at least 100 mm (4 in), laid on undisturbed or well-compacted soil with its top below the slab, draining "to a sewer, drainage ditch or dry well", and where gravity will not do it, "an automatic sump pump shall be provided", with the sump pit at least 750 mm (30 in) deep and 0.25 m² (2.7 ft²) in area.

Pipe, gravel and filter cloth

The three materials each have a rule. The pipe is 100 mm (4 in) minimum and perforated or jointed; the by-law's material standards list clay and concrete drain tile, vitrified clay pipe, flexible plastic drainage pipe and corrugated steel. The stone is the part that gets substituted and should not be: "coarse clean granular material containing not more than 10% of material that will pass a 4 mm sieve" is clear stone, not pit run and not sand, because fines wash into the perforations and the bed stops draining. The fabric is a non-woven geotextile laid in the trench, up the sides and over the stone, so that soil stays out; the Filter Fabric row is the perimeter times the width plus twice the depth of the bed, which is the wrap with no allowance for laps or the extra needed to turn it over the top. The stone weight uses a bulk density you can change; the default 1.6 t/m³ (100 lb/ft³) is the low end of the US Army's FM 5-434 range for loose dry gravel, 2,700 to 3,000 lb per cubic yard, which is 1.60 to 1.78 t/m³. Stone is sold by the tonne or the ton, so that row is the order.

What this tool does not do

It measures a straight run of pipe and a rectangular bed. It does not count fittings, elbows, tees, the cleanout risers or the connection to the sump; it does not size the sump pit or pump, set the fall, or decide between an interior and an exterior drain; and it does not design the drainage layer under the slab, which Section 9.14.4 treats separately as a continuous bed of the same clean stone laid at least 125 mm deep beneath the footing and extending at least 300 mm beyond its outside edge. An existing wet basement is a diagnosis, not a quantity, and belongs to a drainage contractor or an engineer.

Adjusting the defaults

Every input is editable. The perimeter is the length of footing the pipe follows, in metres or feet. The trench width and gravel depth are the stone bed around the pipe; the pipe diameter is deducted from the depth to give the cover. The allowance is for corners, fittings and risers, 5% to start. The stone density is the bulk weight of loose clear stone, and the price is per metre or per foot of pipe; leave it at zero for quantities only.

On-site considerations

The two things that go wrong on site are the level and the backfill. The pipe is laid on undisturbed or well-compacted ground with its top below the underside of the slab, so that the slab and the footing joint are above the water line the drain sets; a pipe laid high drains nothing. The stone goes in clean and is covered with the fabric before any soil is placed, and where the site is wet and soil gets into the stone, Section 9.14.4.4 asks for enough extra stone that the top 125 mm stays clean. Cleanout risers at one or two corners let the line be flushed later, and the outlet, sump or daylight, is tested before the trench is closed.

Using this alongside other BuildMetricLab tools

Size the trench with the excavation volume calculator, the stone under the slab with the crushed stone base calculator, and a yard drain that runs away from the house with the French drain calculator. All BuildMetricLab tools run in your browser with no sign-up, and the formula is on the page so the maths can be checked.

Sources & methodology

Pipe = footing perimeter × (1 + allowance %). Stone volume = perimeter × trench width × gravel depth; stone weight = volume × bulk density. Stone over the pipe = gravel depth − pipe diameter, compared with 150 mm (6 in). Filter fabric = perimeter × (trench width + 2 × gravel depth), no laps. Pipe cost = pipe length × price per unit length. US inputs in ft, in, lb/ft³ and $/ft are converted to m, mm, t/m³ and $/m first. References: National Building Code of Canada Part 9 Section 9.14.3, as reproduced in the Vancouver Building By-law 2019 (pipe not less than 100 mm, laid on undisturbed or well-compacted soil with its top below the slab, covered top and sides with not less than 150 mm of clean granular material with not more than 10% passing a 4 mm sieve); IRC 2021 R405.1 (drain at or below the top of the footing, 2 in of gravel below, 6 in above, filter membrane); FM 5-434 Table 1-2 loose dry gravel 2,700 to 3,000 lb/yd³ (1.60 to 1.78 t/m³).

Frequently asked questions

Are weeping tile calculator results accurate enough to order materials?

Yes, for the pipe and the stone around it. The pipe is the footing perimeter plus the allowance, the stone is the bed's cross-section times the perimeter and is given by volume and by weight, and the fabric is the wrap without laps. What is not in the count is the fittings, the cleanout risers, the sump and the laps on the fabric; those are added from the layout.

What wastage percentage should I use?

The 5% default covers the corners, where the pipe is cut and joined, the risers to cleanouts and the connection to the sump. Raise it for a footing with many returns or where risers are planned at every corner; a plain rectangle with one cleanout can take less. Stone and fabric have no allowance in the count, so an extra fraction of a tonne of stone and the fabric laps are added at the order.

Does this replace professional advice?

No. It measures pipe, stone and fabric. Whether the drain goes inside or outside the footing, where it falls to, how the sump is sized and whether an existing basement needs a drain at all are for a drainage contractor or an engineer, under the National Building Code Section 9.14 in Canada and the IRC Section R405 in the United States. For work that affects structure, gas, electrics, plumbing or drainage to a public sewer, use a suitably qualified professional.

Can I change the unit prices?

Yes. The price per metre or per foot of pipe is an input, and the cost row is that price times the pipe length with the allowance. Stone and fabric are not priced here because they are bought by the tonne and the roll; the weight and area rows are what to give the supplier. Leave the price at zero to see quantities only.