What this tool does

Builds a costed bill of materials for a solar system — panels, batteries, inverter, controller, mounting, cabling and labour — with a contingency and cost per kW.

Enter the quantity and price of each component plus labour and a contingency; the calculator totals the bill of materials and the cost per kW.

Inputs
W
$
$
$
$
$
$
$
%
Result

Total System Cost

$7,315.00

8 × Panels (430 W)
$1,200.00
2 × Batteries
$2,400.00
Inverter + Controller
$1,150.00
Mounting + Cabling
$700.00
Labor
$1,200.00
Subtotal before Contingency
$6,650.00
Contingency (10%)
$665.00
Cost per kW
$2,126.45 / kW (3.44 kW)

Diagram

8 × panel (430 W)$1,2002 × battery$2,400Inverter$900Charge controller$250Mounting / racking$400Cabling & connectors$300Labour$1,200Contingency (10%)$665Total$7,315$2,126 / kW · 3.44 kW system
Plain Estimate
From BrightScale Labs
Invoice maker
Quote at the door. Signed on the spot.
Estimates and invoices for trades, built while you are still in the room.
Scan to get
Get it onGoogle Play

People also use

Formula Used
Total=(∑qipi+labour)⋅(1+c)Total = \left(\sum q_i p_i + labour\right)\cdot(1+c)
qipiq_i p_i
Quantity × unit price of each line
labourlabour
Installer labour
cc
Contingency fraction

How the solar system cost estimator works

The estimator adds up a bill of materials in the way an installer's quote does. Panels and batteries are a quantity times a unit price. The inverter, charge controller, mounting, cabling and labor are single figures. Those lines make the subtotal, and the contingency is then added as a percentage of the subtotal:

Total = (panels × price per panel + batteries × price per battery + inverter + controller + mounting + cabling + labor) × (1 + contingency ÷ 100)

Cost per kW = total ÷ (panel count × panel wattage ÷ 1,000)

With the default entries the subtotal is $1,200 for panels (8 × $150), $2,400 for batteries (2 × $1,200), $900 for the inverter, $250 for the controller, $400 for mounting, $300 for cabling and $1,200 for labor, which comes to $6,650. A 10% contingency adds $665, giving a total of $7,315. Eight 430 W panels make 3.44 kW, so the cost per kW is $7,315 ÷ 3.44 = about $2,126. This tool has no length or area inputs, so there is nothing to convert between metric and imperial units; only the currency symbol differs between versions.

What you enter

Every field is something you can read off a quote or a datasheet. Panel count, battery count and panel wattage are whole numbers or ratings printed on the product. Panel and battery prices are per unit. If a supplier quotes per watt, multiply by the panel rating: a 430 W panel at $0.35 per watt is $150.50. The inverter, controller, mounting and cabling fields take the total for that group. The labor field is the installer's own figure, and the contingency is a percentage.

Leave a price blank and the tool treats it as nothing bought. That is useful for a grid-tied system with no batteries (set the battery count to 0) or a hybrid inverter that already includes the charge controller (blank the controller price, so it is not paid for twice). A blank count, a fractional count such as 7.5 panels, a negative figure or a contingency outside 0 to 100% is refused with a message, not quietly replaced.

Reading the result

The headline figure is the total including contingency. Underneath it, the breakdown shows each group, the subtotal before contingency, the contingency amount and the cost per kW. The breakdown is the useful part: change one line and the total moves by exactly that amount, so you can see what a larger battery or a pricier inverter really adds.

Cost per kW divides by panel capacity only, not by battery capacity. That is how most quotes compare systems, but it flatters a system without batteries and penalises one with them. Take a second example. Six 430 W panels (2.58 kW) at $150 each, no batteries, a $900 inverter, no separate controller, $400 mounting, $300 cabling and $1,200 labor give a subtotal of $3,700. A 12% contingency adds $444 for $4,144, or $1,606 per kW. The default system costs $2,126 per kW, but most of that difference is the $2,400 of batteries, not the panels. Compare like with like, and compare quotes both with and without storage.

Safe by design

This calculator does the arithmetic of costing a system. It deliberately stops at the line a certified installer must sign off. It will never tell you a cable or fuse size, an earthing arrangement, a battery charge voltage or a roof structural load: those are regulated calculations where a wrong number can cause fire, electric shock or a collapse. All electrical work must be carried out by a qualified, certified installer, and this page is not an installation guide. In the United States, the electrical work on a solar system is governed by the National Electrical Code (NFPA 70), Article 690 on solar photovoltaic systems, as adopted and amended by your state or city, and the local building department normally issues the permit and inspects the job. The North American Board of Certified Energy Practitioners (NABCEP) runs a voluntary certification for installers, and asking whether the person quoting holds it is a fair question. Federal and state incentives, utility interconnection fees and sales tax are outside this tool; treat any of them as a separate line you add or subtract yourself.

Assumptions and limits

Every price is your own. Nothing is built in, because component prices move constantly and differ between suppliers and countries, so any default would go stale. The pre-filled values exist only so the page shows a worked result on first load. Replace all of them with figures from your own quotes before relying on the total.

The estimate covers the hardware and labor you list. It does not include scaffolding or access equipment, roof repairs, a new consumer unit or distribution board, monitoring hardware, permit and inspection fees, grid-connection paperwork or incentives. If a quote lists any of those, add them to the labor or mounting field. A contingency of 10 to 15% is a common allowance for extra fixings, difficult access and small surprises, and it is a rule of thumb, not a standard. Use the higher end for a first installation, a complicated roof or an old building. Panels have a rated power measured under standard test conditions, so the kW figure is nameplate capacity, not what the system produces on an ordinary day. For output, use a yield calculator.

Using it with the rest of BuildMetricLab

Costing is one step in planning a system. Start with the energy figure you need, size the array, then come back here to price it. The cost per kWh generated and battery cost per kWh tools take your total from this page and turn it into a cost per unit of energy, which is the fairest way to compare a solar system with grid power or with another quote. The off-grid versus grid-tied tool helps decide whether batteries belong in the quote at all. For independent background on system types, installer selection and what a quote should contain, see the references below. Every BuildMetricLab tool runs in your browser, with no sign-up, and the formula is shown on the page so you can check the maths.

Sources & methodology

Total = (Σ quantity × unit price + labor) × (1 + contingency), and cost per kW = total ÷ (panel count × panel wattage ÷ 1,000). Every result is calculated from the values you enter; no prices, tariffs or incentives are built in. The panel and battery counts must be whole numbers, prices may be blank (none) but not negative, and the contingency must be 0 to 100%.

Frequently asked questions

Why do I enter my own prices?

Component and labor prices change constantly and vary by supplier, state and country, so any built-in figure would soon be out of date. Entering your own quotes keeps the total tied to what you are really being offered. The pre-filled numbers are placeholders to show a worked result.

What contingency should I add?

A 10-15% contingency is a common rule of thumb for extra fixings, access difficulties and small surprises; it is not a code or standard figure. Complex roofs, first-time installs and older buildings justify the higher end. Enter 0 if your installer has given you a fixed price.

What is cost per kW?

It is the total divided by the installed panel capacity in kW (panel count × panel wattage ÷ 1,000). It lets you compare quotes of different sizes. Because it ignores battery capacity, a system with batteries looks dearer per kW than one without, so compare like with like.

Does this include incentives or grid fees?

No. Incentives such as the federal solar tax credit and state or utility rebates, plus interconnection fees and sales tax, vary by location and change over time, so they are left out. Add or subtract your own figures separately, using the current rules where you live.

Spotted something off?